- Mon-Fri 8:00 am-6:00 pm
- +91 8320289721
- info@bhclbaroda.com
BARODA HEAT-UP CONTROLS PVT. LTD.
LIST OF MAJOR JOBS EXECUTED
AT FERTILIZER & CHEMICAL INDUSTRIES
SR.NO. | CLIENT | YEAR | TYPE OF JOB | TYPE OF PLANT | INSPECTED BY |
1 | M/s. Tata Chemicals, Babrala Through ACC | MAR.'02 | Refractory Dryout | R.G. Boiler Insulate & Dense Layer | TCL, ACC |
2 | M/s. Indo Gulf Thru. BHPV, Vizag. | MAR.'02 | Refractory Dryout | R.G. Boiler Insulate & Dense Layer | INDO-GULF, LLOYDS, BHPV |
3 | GHCL, Veraval Thru. ACC Ltd | JUNE'03 | Supervision of Refractory Dryout | Molten Salt Heater | GACL, CBL |
4 | M/s Mitsubishi India Limited, Through Vesuvius India Ltd., Kolkata | OCT’03 | Refractory Dryout | Lime Kiln | GHCL, ACC |
5 | Gujarat Heavy Chemicals Ltd. Veraval Thru. Tata Refractories Ltd., Belpahar | Dec.’04 | Refractory Dryout | Rotary Kiln | VIL, MITSUBISH I |
6 | Indian Farmers & Fertilizers CO, Phulpur, Allahabad, Thru. Ciria India Ltd., Noida | Oct.’06 Jan ’07 To July’07 | Refractory Dryout | 4 Nos Vertical Kiln | GHCL, TRL |
7 | Indo Gulf Fertilizers Ltd, Jagdishpur Thru Ciria India Ltd. | Apr ‘07 | Refractory Dryout | Secondary Reformer | IFFCO CIL |
8 | Indo Gulf Fertilizers Ltd, Jagdishpur Thru Ciria India Ltd. | May ’07 | Refractory Dryout | Secondary Reformer & R.G. Boiler | IGFL CIL |
9 | Nagarjuna Fertilizers, Kakinada, A.P. Thru Ciria India Ltd | Apr.’08 | Refractory Dryout | Secondary Reformer | NFL, CIL |
10 | Tata Chemicals Ltd., Babrala thru Ciria India | Nov.’08 | Refractory Dryout | Secondary Reformer | TCL/ CIL |
11 | Larsen & Toubro Ltd, Mulund, Thru Ciria India Ltd., Noida | Nov.’08 | Refractory Dryout | Cold Collector & R G Boiler | L&T/ CIL |
12 | Larsen & Toubro Ltd, Hazira Thru Ciria India Ltd., | Dec.’08 & Feb.’09 | Refractory Dryout | 1 No, Reforming Exchanger & 1 No, Dome Portion of Reforming Exchanger | L&T/ CIL |
13 | Larsen & Toubro Ltd, Mulund, Thru Ciria India Ltd., Noida | Feb.’09, Mar’09 | Refractory Dryout | Transfer Line– 8 Stage | L&T/ CIL/ KBR |
14 | Larsen & Toubro Ltd, Mulund, Thru Ciria India Ltd., Noida | Apr.’09 & May’09 | Refractory Dryout | Double Chamber of Waste Heat Boiler | L&T/ CIL |
15 | Rastriya Chemicals & Fertilizers Ltd., Chembur, Mumbai, Thru Ciria India Ltd., Noida | Feb’10 to Mar’10 | Supervision for Refractory dryout | Menthol Reformer | RCFL/ L&T/ CIL |
16 | Larsen & Toubro Ltd., Hazira, Surat | Feb’10 | Refractory Dryout | Tube Sheet for Reformer-3 Stage | L&T |
17 | Zuari Industries Ltd., Goa Thru Ciria India Ltd., Noida | Mar’10 | Refractory Dryout | 1ST Layer & 2ND Layer of Secondary Reformer & Transfer Lines | ZIL/ CIL |
18 | Mangalore Chemicals & Fertilizers Pvt Ltd., Mangalore | Apr’10 | Refractory Dryout | Secondary Reformer | MCFPL/ EIL |
19 | Indo Gulf Fertilizers Ltd., Jagdishpur thru Refrac Consultancy, Noida | Apr’10 | Refractory Dryout | R G Boiler | IGF/ ACE/ RCS |
20 | Larsen & Toubro Ltd., Powai/Mulund Works Through STG Refractories Ltd, Mumbai | Jan’11 | Refractory Dryout | 1 No P.G. Boiler | L&T/STG |
21 | Rastriya Chemicals and Fertilizers Ltd, Chembur, Mumbai | April’11 | Refractory Dryout | Secondary Reformer, Temp up to 4000C | RCF |
22 | Rastriya Chemicals and Fertilizers Ltd, Chembur, Mumbai, Thru Ciria India Ltd., Noida | May’11 | Refractory Dryout | Secondary Reformer | RCF/CIL |
23 | Larsen & Toubro Ltd, Mumbai., Through Kaefer Punj Lloyd Ltd, Mumbai | Aug’11 To Nov’11 | Refractory Dryout | Transfer Line | L&T/KPPL |
24 | Gujarat State Fertilizers and Chemicals Ltd, Vadodara, Through ACE Calderys Ltd, Nagpur. | Nov’11 To Dec’11 | Refractory Dryout | 2 Stage Transfer Line, 1 Stage Waste heat Boiler | GSFC/ACE |
25 | Larsen & Toubro Ltd, Mumbai. Thru Ciria India Ltd., Noida | Jan’12 | Refractory Dryout | RG Waste Heat Boiler for inlet Chamber | L& T/CIL |
26 | Gujarat State Fertilizers and Chemicals Ltd, Vadodara, Through ACE Calderys Ltd, Nagpur. | Feb’12 | Refractory Dryout | Secondary Reformer | GSFC/ACE |
27 | Gujarat State Fertilizer Corporation, Baroda thru M/s. ACE Calderys, Nagpur | Feb’12 To Mar.’12 | Refractory Dryout | Flue Gas Duct, Flue Gas Chamber & Chimney inPrimary Reformer | GSFC/ACE |
28 | Gujarat Narmada Fertilizer Corpn., Bharuch thru M/s. Thermax Engineering Construction Ltd | Mar.’12 | Refractory Dryout | F M Boiler | GNFC/ TECL |
29 | Tata Chemicals Ltd., Babrala thru Ciria India Ltd., Noida | April’12 | Refractory Dryout | Intermediate Chamber & Cold Collector | TCL/ CIL |
30 | ISGEC Ltd., Yamuna Nagar Thru Ciria India Ltd., Noida | May’12 | Refractory Dryout | Transfer Line and Manway Plug | IJT/ CIL |
31 | Radiant Hi-Tech Engineering Pvt Ltd., Savli, Baroda | May’12 To June’12 | Refractory Dryout | Co Boiler Duct & J Bend | RHEPL |
32 | National Fertilizer Ltd, Bhatinda thru M/s. Ciria India Ltd., Noida | June’12 & July’12 | Refractory Dryout | 2 Nos Secondary Reformer | NFL/ CIL |
33 | National Fertilizer Ltd, Panipat thru M/s. Ciria India Ltd., Noida | June’12 & July’12 | Refractory Dryout | 2 Nos Secondary Reformer | NFL/ CIL |
34 | L&T Ltd., Powai, Mumbai thru M/s. Kaefer Punj Lloyds Ltd., Gurgaon | June’12 | Refractory Dryout | Transfer Line | L&T/ KPLL |
35 | Gujarat State Fertilizer corporation, Baroda thru M/s. Calderys India Refractories Ltd., Nagpur | July- Aug’12 | Refractory Dryout | 2 Nos Picktel Box of Primary Reformer | GSFC/ CIRL |
36 | NFL, Nangal, Punjab thru M/s. Ciria India Ltd., Noida | Dec’12 | Refractory Dryout | Secondary Reformer | NFL/ CIL |
37 | Stewarts & Lloyds of India Ltd., Kolkata thru M/s. Ciria India Ltd, Noida | Jan’13 | Refractory Dryout | Convection Section | S&L/ CIL |
38 | Padmaja Systems & Service Pvt. Ltd., Chennai thru M/s. L& T Ltd., Powai, Mumbai. | Jan’13 | Refractory Dryout | Effluent Chamber Transfer Line | PSPL/L&T |
39 | Indian Farmer and Fertilizer Co- operative Ltd., Paradeep | Feb’13 | Refractory Dryout | Sulphur Furnace | IFFCO |
40 | Petron Engineering Construction Ltd., Mumbai | Mar’13 | Refractory Dryout | Duct 3 stages | PECL |
41 | L&T Ltd., Powai, Mumbai Thru M/s. Ciria India Ltd., Noida | Mar’13 | Refractory Dryout | R G Boiler 2 Stages | L&T/ CIL |
42 | L&T Ltd., R&C Mulund, Mumbai Thru M/s. Ciria India Ltd., Noida | Mar’13 | Refractory Dryout | Critical Flow Nozzle | L&T/ CIL |
43 | Matix Fertilizer Ltd., Panagarh, W B thru M/s. Ciria India Ltd., Noida | Apr’13 | Refractory Dryout | Secondary Reformer | MFL/ CIL |
44 | L&T Ltd., Mulund, Mumbai thru M/s. Ciria India Ltd., NOIDA | Apr’13 | Refractory Dryout | Forth Stage Separator with Fine Collection Hopper and Manway Plug & Nozzle | L&T/ CIL |
45 | Spetech Plant Equipment Pvt Ltd., Sachin, Surat | May’13 June’13 July’13 | Refractory Dryout | 4 Stages of Transfer Line and Cold header Pipe | SPEPL |
46 | GAIL (I) Ltd., Dibiyapur, Dist. Auraiya thru M/s. Petron Engineering Contn Ltd., Mumbai | June’13 July’13 | Refractory Dryout | 9 Stages of Convection Module | GAIL/ EIL/ PECL |
47 | L&T Ltd., R&C, Mulund, Mumbai thru M/s. Ciria India Ltd., Noida | June’13 | Refractory Dryout | Waste Heat Boiler | L&T/ CIL |
48 | Brahmaputra Valley Fertilizer Corpn Ltd., Assam thru M/s. Refrac Consultancy & Services, Noida | July’13 | Refractory Dryout | R G Boiler | BVFCL/ RCS |
49 | L&T Ltd., R&C Mulund, Mumbai thru M/s. Lizmontagens India Ltd., Mumbai | July’13 | Refractory Dryout | Transfer Line Exchanger | L&T/ LIPL |
50 | GAIL (I) Ltd., Dibiyapur, Dist. Auraiya thru M/s. Petron Engineering Contn Ltd., Mumbai | Aug’13 – Nov’13 | Refractory Dryout | Stack & Duct- Total 4 Stages | GAIL/ EIL/ PECL |
51 | L&T Ltd., Mulund, Mumbai thru M/s. Ciria India Ltd., Noida | Oct.’13 | Refractory Dryout | R G Boiler-1No, PG Boiler-2 Nos | L&T/ CIL |
52 | L&T Ltd., Powai, Mumbai thru M/s. Ciria India Ltd., Noida | Nov- Dec.’13 | Refractory Dryout | Waste Heat Boiler & Steam Super Heater | L&T/ CIL |
53 | Matix Fertilizer & Chemicals Ltd., Panagarh, Durgapur thru M/s. Ciria India Ltd., Noida | Dec.’13 | Refractory Dryout | Start-up Heater | MFCL/ CIL |
54 | L&T Ltd., R&C Mulund, Mumbai thru M/s. STG Refractories Ltd., Mumbai | Feb.’14- Mar’14 | Refractory Dryout | 3 Nos Waste Heat Boiler | L&T/ STGRL |
55 | Chambal Fertilizer & Chemicals Ltd., Kota thru M/s. Ciria India Ltd., Noida | Mar.’14 | Refractory Dryout | T-Portion of Transfer Line | CFCL/ CIL |
56 | L&T Ltd., Hazira, Surat thru M/s. Ciria India Ltd., Noida | Mar.’14 To April’14 | Refractory Dryout | 3 Nos LPH Reactor | L&T/ CIL |
57 | L&T Ltd., R&C Mulund Works thru M/s. Lizmontagens India Pvt Ltd, Mumbai | Mar.- May’14 | Refractory Dryout | Secondary Reformed Waste Boiler, Steam Super Heater, Bellow of secondary Reformer Waste Heat Boiler, Nozzle of Waste heat Boiler | KBR/ L&T/ LIPL |
58 | Mangalore Chemicals & Fertilizers Ltd., Mangalore thru M/s Ciria India Ltd., Noida | Apr.’14 | Refractory Dryout | Secondary Reformer & MG Boiler | MCFL/ CIL |
59 | Mangalore Chemicals & Fertilizers Ltd., Mangalore thru M/s. Castwel Industries, Nagpur | Apr- May’14 | Refractory Dryout | Flue Gas Boiler | MCFL/ CI |
60 | Matix Fertilizer & Chemicals Ltd., Panagarh, West Bengal thru M/s. Ciria India Ltd., Noida | Mar- May’14 | Refractory Dryout | Transition Section, Convection Section, Hot Leg, Cold Leg, Start-up Stack, GT Duct, Flue Gas Duct, Cross Over Duct & Stack | MFCL/ CIL |
61 | Essar Heavy Engineering Services, Hazira thru M/s. Ciria India Ltd., Noida | May ’14 | Refractory Dryout | Effluent Chamber Transfer Line & Manway Plug | EHES/ CIL |
62 | Bilfinger Plant Equipment Pvt Ltd., Surat | May ’14 | Refractory Dryout | Stack | BPEPL |
63 | L&T Ltd., R&C Mulund Works thru M/s. Lizmontagens India Pvt Ltd, Mumbai | May ’14 | Refractory Dryout | Nozzle of Waste Heat Boiler | L&T/ LIPL |
64 | Godrej & Boyce Mfg Co Ltd., Vikhroli, Mumbai A/c. Ciria India Ltd., Noida | July ’14 | Refractory Dryout | Manway Plug & Nozzle of Secondary Reformer | GBMCL/ KBI/ CIL |
65 | ISGEC Yamuna Nagar site, Haryana thru M/s. Ciria India Ltd., Noida | Aug’14 | Refractory Dryo ut with Electrical Coil Heating | Inlet Nozzle of Ammonia Convertor | ISGEC/ CIL |
66 | L&T Ltd., Powai, Mumbai, Thru M/s. Totale Global Pvt Ltd., Chennai | Aug’14 | Refractory Dryout | 2 stages of Transfer Line | L&T/ TGPL |
67 | ISGEC Hitech Zosen Ltd., Dahej, Dist Bharuch thru M/s. Ciria India Ltd., Noida | Sept’14 | Refractory Dryout | Transfer Line and Manway Cover | KBR/ CIL |
68 | L&T Ltd., Mulund, Mumbai thru M/s. Lizmontagens India Pvt Ltd., Mumbai | Sept- Oct’14 | Refractory Dryout | Reformed Gas Waste Heat Boiler- 2 Nos, Steam Superheater-2 Nos, Expansion Bellow-2 Nos | KBR/ L&T/ LIPL |
69 | ISGEC Dahej, Dist Bharuch, Gujarat Thru M/s. Ciria India Ltd., Noida | Nov’14 | Refractory Dryout | Manway Plug - MH1 & MH2 and Top Cover of Secondary Reformer | ISGEC/ CIL |
70 | ESSAR Heavy Engineering Ltd., Hazira, Surat thru M/s. Lizmontagens India Pvt Ltd., Mumbai | Dec.’14 | Refractory Dryout | 6 stage of Manifold -1 to Manifold -6 of Steam Reformer Outlet | ESSAR/ LIPL/ITT |
71 | National Fertilizer Ltd., Guna thru M/s. Ciria India Ltd., Noida | Apr’15 | Refractory Dryout | Secondary Reformer and Transfer Line ‘T’ Portion | NFL/ CIL |
72 | IFFCO, Paradeep, Orissa thru M/s. Furnace Fabrica India Ltd., Mumbai | May’15 | Refractory Dryout | Sulphur Combustion Furnace | IFFCO/ FFIL |
73 | John Galt International, Thane thru M/s. L&T Ltd., Powai, Mumbai | July’15 | Refractory Dryout | Waste Heat Boiler, Steam Super Heater and Expansion Bellow | KBR/L&T |
74 | Larsen & Toubro Ltd., Powai Mumbai thru M/s. STG Refractories Pvt Ltd. Mumbai | Sept’15 | Refractory Dryout | Double Chamber Waste Heat Boiler | L&T/ STGRL |
75 | L&T Ltd., Ranoli, Baroda thru M/s. Refrac Consultancy Services, Noida | Sep’15 To Nov’15 | Refractory Dryout | 70 Stages of Cyclones & Cross Over Ducts and Diplegs | L&T/ RCS |
76 | L&T Ltd., Ranoli, Baroda thru M/s. Refrac Consultancy Services, Noida | Nov’15 To Dec’15 | Refractory Dryout | 23 Stages of dust Hopper, Diplegs, Hot strokes & Plenum | L&T/ RCS |
77 | L&T Ltd., Powai, Mumbai thru M/s. STG Refractories Pvt Ltd., Mumbai | Dec’15 To jan’16 | Refractory Dryout | Steam Super Heater and Spool Piece, 3 Nos Manway plug of Steam Super Heater | L&T/ SRPL |
78 | Deepak Fertilizer & Petrochemicals Corporation Ltd., Taloja, Raigarh thru M/s. Pacific Refractories Ltd., Mumbai | Feb’16 | Refractory Dryout | Boiler -D | DFPCL/ PRL |
79 | Zuari Agro Chemicals Ltd., Goa thru M/s. Ciria India Ltd., Noida | Feb- Mar’16 | Refractory Dryout | Hot Face Layer and Back-up Layer of Secondary Reformer | ZACL/ CIL |
80 | L&T Ltd., Powai, Mumbai thru M/s. Phisem Consultancy Services Pvt Ltd., Noida | Feb- Mar’16 | Refractory Dryout | R G Boiler and Spool Piece | L&T/ PCSPL |
81 | L&T Ltd., Powai., Mumbai thru M/s. Ciria India Ltd., Noida | Mar’16 | Refractory Dryout | Double Chamber R G Boiler | L&T/ CIL |
82 | Tata Chemicals Ltd., Babrala thru M/s. Ciria India Ltd., Noida | April’16 | Refractory Dryout | Flare Stack, R G Boiler and Cold Collector | TCL/ CIL |
83 | Deepak Fertilizer & Petrochemicals Ltd., Taloja, Raigarh thru M/s. Ciria India Ltd., Noida | April’16 | Refractory Dryout | De-hydrogenation and Refractory dryout of Secondary Reformer | DFPL/ CIL |
84 | L&T Ltd., Ranoli, Vadodara thru M/s. Refrac Consultancy & Services Pvt Ltd., Noida | May’16 To July’16 | Refractory Dryout | 15 stages of Riser Arm, Dipleg, Upper cyclone, Riser outlet tube | L&T/ RCSPL |
85 | Gopinath Engg Co Pvt Ltd., Taloja, Mumbai thru M/s. Ciria India Ltd., Noida | May’16 | Refractory Dryout | J- Bend | GECPL/ CIL |
86 | ISGEC Hitachi Zosen Ltd., Dahej, Dist. Bharuch thru M/s. Ciria India Ltd., Noida | June’16 | Refractory Dryout | Transfer Line & Manway Plug | KBR/ ISGEC/ CIL |
87 | Indian Farmer Fertilizer Co-op Ltd., Aonla, Bareilly Thru M/s. Phisem Consultancy Services Pvt Ltd., Noida | June’16 | Refractory Dryout | R G Boiler and Joint of Spool Piece | L&T IFFCO/ PCSPL |
88 | Indian Farmer Fertilizer Co-op. Ltd., Paradeep, Orissa. Thru M/s. Furnace Fabrica India Ltd., Mumbai | June’16 | Refractory Dryout | Sulphur Combustion Furnace | IFFCO/ FFIL |
89 | John Galt International, Badlapur, Dist. Thane | June’16 | Refractory Dryout | Secondary Reformer Waste Heat Boiler, Steam Super Heater & Expansion Bellow | KBR/ JGI/ L&T |
90 | ISGEC Hitachi Zosen Ltd., Dahej, Dist. Bharuch thru M/s. Ciria India Ltd., Noida | Aug’16 | Refractory Dryout | Top Cover Nozzle C and manway Plug MH-1 & 2 of Secondary reformer | KBR/ ISGEC/ CIL |
91 | ISGEC Hitachi Zosen Ltd., Dahej, Dist. Bharuch thru M/s. Ciria India Ltd., Noida | Aug’16 | Refractory Dryout | Effluent Chamber & Manway Plug of MH-1, Transfer Line-3 stage | KBR/ ISGEC/ CIL |
92 | The Fertilizers and Chemicals Travancore Ltd., Kochi, Kerala, thru M/s. Pacific Refractories Ltd., Mumbai | Feb’17 | Refractory Dryout | Sulphur Combustion Furnace & K1 Boiler | TFCTL/PRL |
93 | Thermal Systems Hyderabad Pvt Ltd., IDA, Bollaram, Hyderabad thru M/s. Ciria India Ltd., Noida | Mar’17 | Refractory Dryout | Steam Super Heater | TSHPL/CIL |
94 | Godrej & Boyce Mfg Co. Ltd., Vikhroli, Mumbai thru M/s. Ciria India Ltd., Noida | March and May’17 | Refractory Dryout | Manway Plug of Secondary Reformer | GBMCL/CIL |
95 | Indo Gulf Fertilizer Ltd., Jagdishpur, UP thru M/s. Refrac Consultancy & Services Pvt Ltd., Noida | Mar’17 | Refractory Dryout | R G Boiler | IGFL/RCSPL |
96 | Deepak Fertilizer & Petrochemicals Corpn Ltd., Taloja Dist Raigad thru M/s. Ciria India Ltd., Dahej | Mar-April’18 | Refractory Dryout | Borsing Boiler | DFPCL/CIL |
97 | Grasim Industries Ltd., Jagdishpur Indl. Area, Dist. Amethi thru M/s. Refrac Consultancy & Services Pvt Ltd., Noida | April’18 | Refractory Dryout | R G Boiler | GIL/RCSPL |
98 | Chambal Fertilizer and Chemicals Ltd., Kota, Rajasthan thru M/s. Ciria India Ltd., Noida | April-May’18 | Refractory Dryout | G T Duct, Start-up Stack, Hot Leg, Cold Leg & Convection Section | TEIL/HPIPL/ CFCL/CIL |
99 | Indian Farmer Fertilizer Co-operative, Paradeep thru M/s. Castwel Industries | May’18 | Refractory Dryout | 3 Nos Hot Air Generator | IFFCO/PRL |
100 | Mangalore Chemical & Fertilizer Ltd.,Mangalore thru M/s. Ciria India Ltd., Noida | May’18 | Refractory Dryout | Secondary Reformer & RG Boiler Outlet Chamber | MCFL/CIL |
101 | Chambal Fertilizer and Chemicals Ltd., Kota, Rajasthan thru M/s. Ciria India Ltd., Noida | May’18 | Refractory Dryout | Secondary Reformer | CFCL/KBR/TEIL/HPIPL/CIL |
102 | Indian Farmer and Fertilizer Ltd., Paradeep thru M/s. Furnace Fabrica India Ltd., Mumbai | June’18 | Refractory Dryout | Sulphur Combustion Furnace in Train -1 | IFFCO/FFIL |
103 | L&T Ltd., Powai, Mumbai thru M/s.Totale Global Pvt Ltd., Chennai | Aug.’19 | Refractory Dryout | 2 stages of Transfer Line | L&T/TGPL |
104 | Dangote Fertilizer, Nigeria through Phisem Consultancy, Noida. | April’19 To June’19 | Refractory Dryout | 2 Nos Secondary Reformer and 2 Nos RG Boiler | Dangote/OCL/ PCSPL |
105 | ISGEC, Dahej site, Gujarat thru M/s. Lizmontagens India Pvt Ltd., Mumbai | Aug.’19 | Refractory Dryout | Steam Super Heater | ISGEC/LIPL |
106 | ISGEC, Dahej, Dist. Bharuch Thru M/s. Lizmontagens India Pvt Ltd | Nov. ’19 | Refractory Dryout | Waste Heat Boiler alongwith Expansion Bellow | ISGEC/LIPL |
107 | L&T Ltd., Hazira, Surat thru M/s. Totale Global Pvt Ltd., Chennai | Nov.’19 | Refractory Dryout | 1 stage of Transfer Line, Manway Plug & 7 Nos Riser in 2 stages | L&T/TGPL |
108 | L&T Ltd., Powai, Mumbai thru M/s. STG Refractories Service Pvt Ltd/. Mumbai | Jan’20 to Feb’20 | Refractory Dryout | 2 Nos Steam Super Heater | L&T/SRSPL |
109 | Hindustan Urvarak & Rasayan Ltd.,Gorakhpur thru M/s. Phisem Consultancy Pvt Ltd., Noida | Feb.’20 to July’20 | Refractory Dryout | Duct Below GT Start-up Stack, 2 stage stack, 1stage start-up Stack | HURL/PCSPL |
110 | ISGEC, Yamuna Nagar, Haryana thru M/s. Lizmontagens India Pvt Ltd., Mumbai | Feb.’20 | Refractory Dryout | Nozzle of Ammonia Convertor | ISGEC/LIPL |
111 | L&T Ltd., Powai, Mumbai thru Calderys India Refractories Ltd., Nagpur | Feb.’20 To June’20 | Refractory Dryout | 13 Stages of Cold Collector for HURL Sindri & Barauni Project | L&T/CIRL |
112 | Mangalore Chemical & Fertilizer Ltd., Mangalore thru M/s. Total Global Pvt Ltd., Chennai | Mar.’20 | Refractory Dryout | 1 stage of R G Boiler - Inlet Channel | MFCL/TGPL |
113 | Hindustan Urvarak & Rasayan Ltd., Sindri site, Dhanbad thru M/s. Ciria India Ltd., Noida | Sept-Dec’20 | Refractory Dryout | 1st layer of Secondary Reformer and PR Stack Module, Startup stack, FGD, ID Fan to stack-3, | HURL/CIL |
114 | Hindustan Urvarak & Rasayan Ltd., Barauni, Bihar thru M/s. Ciria India Ltd., Noida | Sept-Nov’20 | Refractory Dryout | 1st Layer of Secondary Reformer, Sartup Stack, CAPH to ID duct, FGD, CAPH to ID | HURL/CIL |
115 | Mangalore Chemical and Fertilizer Ltd. Mangalore thru Pacific Refractories Ltd., Mumbai | Oct’20 | Refractory Dryout | Combustion Chamber | MFCL/PRL |
116 | L&T Ltd., Hazira, Surat site thru M/s. Totale Global Pvt Ltd., Chennai | Oct’20 | Refractory Dryout | Transfer Line | L&T/TGPL |
117 | ISGEC HeavyEngineering Ltd.,Radaur Road, Yamuna Nagar thru Ciria India Ltd., Noida | Oct’20 | Refractory Dryout | Ammonia Convertor | IHEL/CIL |
118 | Hindustan Urvarak Rasayan Ltd., Gorakhpur, UP thru M/s. Ciria India Ltd., Noida | Oct’20 | Refractory Dryout | Secondary Reformer (KBR Design) | HURL/ CIL |
119 | The Fertilizer and Chemical Travancore Ltd., Udyogamandal, Kochi thru M/s. Pacific Refractories Ltd.,Mumbai | Oct’20 | Refractory Dryout | Incinerator Chamber | FACT/PRL |
120 | Hindustan Urvarak & Rasayan Ltd., Gorakhpur, UP thru M/s. Phisem Consultancy Services Pvt Ltd | Jan’21 | Refractory Dryout | 1 stage of Start-up Stack and1 stage of Cross Over Duct, Cold Leg Bottom to ID Fan Inlet Duct, ID Fan Inlet Duct, Hot Leg Bottom Duct and Transition Duct of Primary Reformer | HURL/PCSPL |
121 | Chambal Fertilizer and Chemicals Ltd., Gadepan, Dist. Kota | Mar.’21 | Refractory Dryout | Removal of Moisture from Refractory area of Primary Reformer | CFCL |
122 | Hindustan Urvarak Rasayan Ltd., Sindri UP thru M/s. Ciria India Ltd., Noida | April’21 | Refractory Dryout | P R Stack Module – 1 stage | HURL/CIL |
123 | Chambal Fertilizer & Chemicals Ltd., Kota thru M/s. Ciria India Ltd., Noida | April’21 | Refractory Dryout with Electrical coil heating | Nozzle | CFCL/CIL |
124 | Indian Farmer and Fertilizer Co-operative Ltd., Paradeep, Orissa thru M/s. Pacific Refractories Ltd., Mumbai | April’21 | Refractory Dryout | Hot Air Generator DAP – Train A & B – 2 stages, Furnace& Boiler-1 stage | IFFCO/PRL |
125 | Hindustan Urvarak Rasayan Ltd., Barauni thru M/s. Ciria India Ltd., Noida | May’21 & August’21 | Refractory Dryout | 3rd Layer of Secondary Reformer, Horizontal Convection | HURL/CIL |
126 | Fertilizer and Chemical Travancore Ltd., Udyogamandal, Kochi, Kerala thru Ciria India Ltd., Noida | June ’21 | Refractory Dryout | Secondary Reformer with R G Boiler | FACT/CIL |
127 | L&T Ltd., Hazira, Surat, Gujarat thru M/s. Totale Global Pvt Ltd., Chennai | July’21 | Refractory Dryout | 1 stage of Transfer Line and 1 stage of Manway Plug | L&T/TGPL |
128 | Dahej, Dist. Bharuch thru M/s. Lizmontagens India Pvt Ltd., Mumbai | Sept- Oct’21 | Refractory Dryout | 1 stage of Steam Super Heater & 1 Stage of Waste Heat Boiler | ISGEC/LIPL |
129 | Godrej & Boyce Mfg Co Ltd., Vikhroli, Mumbai thru M/s. Lizmontangens India Pvt Ltd., Mumbai | May’22 | Refractory Dryout | Nozzle C, N1, N2, M1, M2, K2 of Secondary Reformer | GBMCL/LIPL |
130 | L&T Ltd., Hazira, Surat thru Ciria India Ltd, Noida | May’22 | Refractory Dryout | 3 Stages of Transfer Line | L&T/CIL |
131 | The Fertilizer and Chemical Travancore Ltd., Kochi, Kerala thru M/s. Pacific Refractories Ltd., Mumbai | May’22 | Refractory Dryout | W3 Evaporator | FACT/PRL |
132 | L&T Ltd., Hazira, Surat thru M/s. Ciria India Ltd., Noida | May’22 | Refractory Dryout | 2 Stages of Transfer Line | L&T/ CIL |
133 | Performance Chemiserve Pvt Ltd., Taloja, Navi Mumbai thru M/s. Ciria India Ltd., Noida | May’22 | Refractory Dryout | 2 stages of Convection Module | DFPCL/TOYO/ PCPL/CIL |
134 | Performance Chemiserve Pvt Ltd., Taloja, Navi Mumbai thru M/s. Ciria India Ltd., Noida | July’22 TO August’22 | Refractory Dryout | 8 stage of FG Duct | DFPCL/TOYO/ PCPL/CIL |
135 | Deepak Fertilizer and Petrochemicals Corporation, Taloja, Mumbai thru M/s. Ciria India Ltd., Noida | Oct’22 | Refractory Dryout | Borsing Boiler | DFPCL/CIL |
136 | Performance Chemiserve Pvt Ltd., Taloja, Navi Mumbai thru M/s. Ciria India Ltd., Noida | Nov’22 to Feb’23 | Refractory Dryout | 6 Stages of Stack, 1 stage Header Box, 1 stage Convection Cold leg | PCPL/CIL |
137 | Deepak Fertilizer and Petrochemicals Corporation, Taloja, Mumbai thru M/s. Ciria India Ltd., Noida | Feb’23 | Refractory Dryout | Secondary Reformer (KBR Designed) | DFPCL/CIL |
138 | Larsen & Toubro Ltd., Hazira, Surat thru M/s. Adhvaaya Engineering & Construction LLP., Bangalore | Mar.’23 | Refractory Dryout | Waste Heat Boiler | L&T/AEC |
139 | Yara Fertilizer India Pvt Ltd., Babrala UP thru M/s. Phisem Consultancy Services Pvt Ltd., Noida | Mar.’23 | Refractory Dryout | Lined Adiabtic Reformer | YFIPL/PCSPL |
140 | Coromandel International Ltd., Visakhapatnam thru M/s. Pacific Refractories Ltd., Mumbai | May-June’23 | Refractory Dryout | Sulphur Combustion Furnace and Waste Heat Boiler in between Ducts | CIL/PRL |
BHCL is an Engineering Company formed in early 2002, engaged in the business of specialized Engineering Services related to all types of Refractory Dryout jobs and post-weld heat treatment (Stress Relieving) Jobs
Copyright © 2022 BHCL – Baroda Heat-Up Controls pvt.ltd – Developed by SEO Agency in India